The honest answer is that it depends on the lot, but you came here for numbers, so here they are. These are the typical ranges we see for commercial striping work in Connecticut. Every lot gets its own quote, and the only way to get a real number is to send us the address. Still, this will tell you whether you are looking at a few hundred dollars or a few thousand.
Quick answer
| Job | Typical Connecticut range |
|---|---|
| Re-stripe over existing lines | $4 to $10 per stall |
| New layout on bare or sealed asphalt | $12 to $30 per stall |
| Small lot minimum (under 20 stalls) | $400 to $700 for the visit |
| Accessible stall with symbol and aisle | $40 to $150 per stall |
| Stencils (arrows, STOP, RESERVED) | $8 to $60 each |
| Fire lane curb and lettering | Priced per linear foot, usually $1 to $3 |
A 60-stall plaza re-stripe with a couple of accessible stalls and a few arrows usually lands somewhere between $600 and $1,200. A 200-stall office lot laid out from scratch can run $3,000 to $6,000 once you add stencils, fire lanes and crosswalks.
Re-stripe vs. new layout
This is the biggest fork in the price.
Re-striping means the old lines are still visible enough to follow. We clean the lot, run the striper over the existing lines, and refresh the symbols and stencils. It is fast and the per-stall cost is low because there is no measuring.
A new layout means the lines are gone, the lot was just paved or sealcoated, or you want the layout changed. We measure, snap chalk lines, mark every stall and aisle, and then paint. The measuring is where the time goes. It can take as long as the painting on a big lot.
If your lot was sealcoated this year, you are in the new layout column whether you like it or not. The sealer covers everything. The good news is the sealer gives a clean, dark surface and the new lines look great on it.
What makes the price go up
- Stall count. More stalls, more paint, more time. The per-stall price drops as the count goes up, so a 300-stall lot is cheaper per stall than a 30-stall lot.
- Accessible stalls. Each one takes a blue background, the symbol, the cross-hatched aisle and careful layout to the Connecticut dimensions. They are worth doing right, because they are the stalls an inspector looks at first.
- Stencils and text. Arrows, STOP bars, RESERVED, VISITOR, stall numbers, EV CHARGING and custom text are each a separate item. An apartment complex with 150 numbered stalls will pay more than a plaza with 150 blank ones.
- Fire lanes and curbs. Curb painting is slow, careful work and is priced by the foot.
- Lot condition. Loose gravel, standing water, heavy leaf cover or oil spots all add prep time. If the lot needs sweeping before we can paint, that is time on the clock.
- Scheduling. Night, early morning and weekend work is normal for us and we plan it into the quote. A lot that has to be done in sections while it stays open takes longer than one we can close for a morning.
- Travel. We are in Berlin and cover all of Connecticut. Jobs in the far corners of the state get grouped so the drive does not land on one customer.
What does not change the price much
Paint color is the same price in white, yellow or blue. A single-visit job that combines striping, stencils and curbs is cheaper than three separate visits. And a quote is free, so there is no cost to finding out.
How to get an accurate quote
Send us three things and we can usually quote within a business day:
- The property address, so we can look at it from above.
- A rough stall count, or just "it's the plaza at the corner of X and Y."
- What you want: a straight re-stripe, a new layout, or specific fixes like accessible stalls or a fire lane the marshal asked for.
If you have a site plan or an inspector's letter, attach it. It saves a site visit and gets the number right the first time.
Is it worth it?
A re-stripe every two or three years is one of the cheapest things you can do to a commercial property. Faded lines cost you stalls, invite door dings and fender benders, and are the first thing an ADA complaint or a fire marshal walk-through picks on. A few hundred dollars every couple of years is a lot cheaper than any of those.
Request a quote or call Rick at (860) 906-7740 with the address.